by admin | Jul 11, 2022
Home / Projects / Partial Depth Concrete Repair Twenty-five years of exposure to road salt, water and changing temperatures have taken their toll on the parking garage structure at the Mt. Sinai Hospital in New York City. Graciano Corporation, the acknowledged leader...
by admin | Jul 11, 2022
Home / Projects / Partial Depth Concrete Repair Part of a large estate-owned by railroad tycoon George Jay Gould, the Georgian Court Bridge was constructed in 1899, during the Gilded Age, to carry travelers over a man-made lagoon which connected the estate to a nearby...
by admin | Jul 24, 2022
Home / Projects / Partial Depth Concrete Repair Chester Engineers’ Project Engineer, Mark Mellott said, “We were all very impressed with Graciano’s work. They filled all the voids so the integrity of the surface would not compromise the liner and I believe it was the...
by admin | Jul 25, 2022
Home / Projects / Partial Depth Concrete Repair Built by the Rockefeller family in the 1930s, The Cloisters is located on four acres in Manhattan’s Fort Tryon Park, and houses the Metropolitan Museum of Art’s medieval art and architecture collection. The structure...
by admin | Jul 25, 2022
Home / Projects / Partial Depth Concrete Repair The Atlantic Telecom Building, originally known simply as 470 Vanderbilt, previously served as a manufacturing facility but had been vacant for several years. The repair and restoration of this eight-story,...